MIL-T-52698A
4.3.1 Schedule of examinations. The following examinations shall be conducted as a part of the first article to assure conformance to section 3 requirements by using the major and minor requirements of 4.4.2.
Major
101. Dimensions not as specified.
102. Part missing or not specified type or size.
103. Component fractured, split, bowed, malformed, loose, not in alinement or not correctly assembled.
104. Sharp burr, sliver, splinter not ground smooth.
105. Welding and brazing missing, incomplete, burn holes, cracked, fractured, not fused.
106. Underclearance not as specified.
107. UL label missing.
108. Electromagnetic interference suppression on production trucks not identical with first article test model.
109. Materials not as specified.
110. Electrical equipment not as specified, do not function, or are damaged.
111. Maintainability not as specified.
112. Lubrication devices missing, not accessible, or not as specified.
113. Materials are not resistant to corrosion or deterioration or treated to be made resistant to corrosion or deterioration for the
applicable storage and operating environment.
114. Dissimilar metals as defined in MIL-STD-889 are not effectively insulated from each other.
115. Contractor does not have documentation available for identification of material, material finishes or treatments.
116. Welders and welding certification not as specified.
117. Identification plates not as specified.
118. Used, rebuilt, or remanufactured components, pieces or parts incorporated in the trucks.
Minor
201. Finish not dry, free of runs, sags, foreign matter or area of no film, wrong color.
202. Welding and brazing slag inclusion, scale, or flux deposits not removed, not smooth and uniform.
203. Threaded fasteners missing, broken, stripped, fractured, or loose.
204. Identification marking missing, incomplete, not legible.
4.3.2 Tests. Tests shall be conducted as specified herein. All tests shall be made with a fully charged and adequately cycled battery. The procedures outlined herein are intended as guides. Alternate test procedures may be substituted providing the desired results are obtained. However, any deviation from the prescribed procedures shall be subject to prior approval by the contracting officer.
4.3.2.1 Speed. The truck, with capacity load, shall be accelerated on a dry, smooth level surface and timed through an 88-foot interval (88 feet per minute equals 1 mile per hour). Three runs shall be made in both the forward and reverse direction in high speed. This test shall be repeated without
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business