MIL-T-52953C
TABLE I. Inspection schedule. (Cont'd)
First article produced inspection |
Quality conformance |
Number |
Defect |
Requirement paragraph |
x x x x x x x x x x x x x x x x x x x x x x x x |
x x x x x x x x x x x x x x x x x x x x x x x x |
125. 126. 127. 128. 129. 130. 131. 132. 133. 134. 135. 136. 137. 138. 139. 140. 141. 142. 143. 144. 145. 146. 147. 148. |
Battery connector not as specified. Battery warning sign not as specified. Controls and instrumentation not as specified. Discharge indicator not as specified. On-off switch riot as specified. Hour meter not as specified. Lights not as specified. Side shift not as specified. Overhead guard not as specified. Seat not as specified. Treatment and painting not as specified. Walkway coating not as specified. Identification marking not as specified. Transportability not as specified. Tiedown provisions not as specified. Slinging provisions not as specified. Air transportability requirements not met. Rail transportability requirements not met. Highway transportability requirements not met. Contractor does not have documentation available for identification of materials, material finishes, or treatment. Nuclear-biological-chemical protection not as specified. Preservation marking not as specified. Commercial preservation not as specified. Noise limits not as specified. |
3.19.2 3.19.3 3.20.1 3.20.1.1 3.20.1.2 3.20.1.3 3.21 3.22 3.23 3.18 3.25 3.25.1 3.26 3.26.1 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.3.2 3.20.3 5.3 5.2 3.30 |
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business